Job costing means recording every cost against the job that caused it. At the end, you can see what each job earned, not just what the whole company earned.
Why it matters
A company can show a profit for the year while some of its jobs lose money. Without job costing, the good jobs hide the bad ones. You keep bidding the losing kind of work at the same price because nothing tells you to stop.
What gets tracked
Every job has four main kinds of direct cost:
- Labor. Hours worked on the job, including payroll taxes and benefits.
- Materials. What was bought or pulled from stock for that job.
- Subcontractors. Invoices from subs who worked on it.
- Equipment. Rentals, and a fair share of the cost of equipment you own.
Costs that cannot be tied to one job, such as office rent and insurance, are overhead. They are tracked separately.
How to start
- Set up every job in your accounting software. Most systems call these projects or jobs.
- Pick a short list of cost codes. Labor, materials, subcontractors, equipment, and other is enough to begin.
- Code every bill and timesheet to a job. This is the habit that makes it work. A bill with no job is a cost you can no longer explain.
- Record the estimate. Enter what you expected to spend in each category.
- Review estimate against actual every month. Look while jobs are still open, when you can still do something about it.
What you learn
After a few months, patterns show up. One type of job always runs over on labor. One crew finishes under budget. Materials cost more than your price book says. Each of those is a decision you can now make with numbers.
Common mistakes
- Coding costs to jobs only at year end, when no one remembers the details.
- Leaving out labor burden, which makes every job look more profitable than it was.
- Using so many cost codes that no one in the field uses them correctly.
Start simple and stay consistent. A basic system that gets used beats a detailed one that does not.